Sunday, 2 August 2015

Bottle brick build progress

These last few days I've been building on the walls to roof level, or trying to. In some places I'm almost there. I put this witch in a glass tumbler by the door. (See if you can spot a yellow plane in the background which has been flying over all weekend due to a local air show).

This is a view from inside as you walk in around the corner to where the loo will go.
I also date stamped the build with a 2015 coin.
I have a few photos of the outside but I can't seem to manage to get them the right way up...so here (on their sides) are the photos of how the outside walls look. Not long now until I hit the roof level.